Transport Obligations Guidance

Purpose

This interim framework deals with standard charges for transport from residential development, and supports Policy T13 in the Poole Local Plan First Alteration, (Adopted March 2004). It is not Supplementary Planning Guidance (SPG), but it has been through a public consultation process similar to SPG. The standard charge at 31 October 2007 is £1,000 per new residential unit, but this will be updated on 1 April annually with reference to the appropriate Transport Construction index. This interim framework replaces a similar procedure operated in Poole since November 2004, and a parallel interim framework has now been introduced in Bournemouth. During 2008, these two interim frameworks are likely to be replaced by a standard framework for transport charges, applying to Poole,Bournemouth,Christchurch and East Dorset.. It is proposed that this SE Dorset wide framework will be based on the SPG for Purbeck, which has operated since December 2006.

Consultation

Copies of the consultation draft were made available for inspection at: Public Libraries and Strategic Planning Services, Civic Centre (2nd Floor), Poole, Dorset BH15 2RU between 9th July 2007 until 20th August 2007. The proposed modifications to the interim framework in response to consultees were considered in detail by the Local Economy Overview Group on 4 October 2007. The interim framework was approved by the full Council on 30 October 2007. Details of the reports are also availble on this website.

Distribution

Paper copies can also be obtained or viewed from Strategic Planning Services, 2nd Floor, the Civic Centre, Poole BH15 2RU. Tel: 01202 633360 or Transportation Services, St John's House, Serpentine Road, Poole, Dorset BH15 2DX. Tel: 01202 262003.

Strategic Planning
Civic Centre, Poole
BH15 2RU

Tel: 01202 633360

Email: strategic.planning@poole.gov.uk

Copyright © 2008 Borough of Poole - all other trademarks are acknowledged as belonging to their respective owners. All rights reserved.